Projects

SIME DARBY PLANTATION BERHAD/SIME DARBY PLANTATION RESEARCH SDN BHD

SIME DARBY PLANTATION

No

Projects

Amount

1

FABRICATION, INSTALLATION AND COMISSIONING OF CHEMICAL RECYCLING SYSTEM FOR SKIM LATEX FILTRATION AT SIME DARBY PLANTATION, BATU ANAM RUBBER FACTORY

116,388.00 

2

TO FABRICATE, SUPPLY AND INSTALL 0.5m3/hr RO SYSTEM FOR POME WASTE FROM ANAEROBIC DIGESTER UKM/YSD TRUST 6 AND THE TREATED WATER IS USED TO SUPPLY FOR BOILER SYSTEM

211,788.00

3

TO BUILD FACILITIES (CIVIL WORK) AT SDR-UKM/YSD ZERO WASTE TECHNOLOGY DEMONSTRATION PLANT AT KKS TENNAMARAN, BESTARI JAYA, SELANGOR

16,228.60

4

TO CONSTRUCT, SUPPLY, INSTALL TESTING AND COMMISIONING OF 1 UNIT OF MODIFIED ANAEROBIC DIGESTER AT KKS TENAMARAN

459,802.66 

5

TO FABRICATE, INSTALL, TESTING AND COMMISSIONING FOR ENZYME SPRAY SYSTEM AT KKS SUA BETONG, PORT DICKSON 

67,151.00 

6

DESIGN, SUPPLY, FABRICATE, INSTALL, TEST AND COMMISSION OF 0.5M3 /HR RO SYSTEM AND INSTRUMENTATION 

211,788.00

7

SKIM LATEX FILTRATION-BATU ANAM FACTORY

465,901.80

8

TESTING AND COMMISSIONING AT KRUBONG LEACHATE TREATMENT PLANT

85,870.00

9

DESIGN, FABRICATE, SUPPLY, INSTALL, TESTING, COMMISSIONING AND GUARANTEE AND RAINWATER HARVESTING SYSTEM

186,457.69

10

SUPPLY, FABRICATION, DELIVERY TO SITE & INSTALLATION OF ANCILLARY WORKS FOR BAS FILTERATION SYSTEM AT KKS TENNAMARAM

228,150.20

11

TO CONDUCT THE COMMERCIAL TRIAL OF ENZYMATIC ASSISTED EXTRACTION OF PALM OIL FOR ENHANCEMENT OF OIL EXTRACTION AT KKS KOH FOH, NEGERI SEMBILAN

495,136.60

12

FABRICATE, INSTALL AND COMMISSION BIOCATALYST + D3 APPLICATION SYSTEM AT FOUR (4) SIME DARBY PALM OIL MILLS; SUA BETONG MILL, SERI INTAN MILL, GIRAM MILL AND ULU REMIS MILL 

1,276,000.00 

13

ZERO DISCHARGE SYSTEM (PILOT SCALE) AT KKS TENNAMARAM FABRICATE, SUPPLY AND INSTALLATION AT 1MT/HR POME TREATMENT SYSTEM BY USING ELECTRO OXIDATION PROCESS AND INSTALLATION OF CMF, CMBR, NF AND RO SYSTEM

249,800.00

14

TO REPAIR, REFURBISH, TRANSPORT AND INSTALL 2 UNIT TANKS FROM KKS HADAPAN AND SIME DARBY BIODIESEL TO KKS BUKIT BENUT

35,650.00 

15

TO SUPPLY, FABRICATE AND COMMISION OF 1 LOT BIOCATALYST APPLICATION & MONITORING SYSTEM (BAMS) FOR R&D TENNAMARAM EXPERIMENTAL STATION AT BESTARI JAYA

223,084.00 

16

DESIGN, SUPPLY, FABRICATION, INSTALLATION, COMMISSIONING AND TRAINING OF A PILOT AUTOMATED MOBILE WATER TREATMENT SYSTEM 

845,550.00

17

DESIGN, SUPPLY, FABRICATE, INSTALL, TEST, COMMISSION AND GUARANTEE 65MT/HR DEWATERING SYSTEMAT KKS LAVANG, BINTULU SARAWAK

1,727,290.00

18

INSTALLATION OF MEMBRANE SYSTEM OF RECOVERY INTEGRATED SYSTEM AT KKS BENU

694,880.00

19

PROJECT: DESIGN, SUPPLY, FABRICATE, INSTALL, TESTING, COMMISSIONING AND PERFOMANCE GUARANTEE OF DEWATERING SYSTEM AT KKS PAGOH (YEAR 2020) 

1,690,000.00

20

DESIGN, FABRICATE, SUPPLY, DELIVER TO SITE, INSTALL, COMMISION AND GUARANTEE PERFOMANCE OF BIOCATALYST APPLICATION AND MONITORING SYSTEM FOR SIME DARBY PLANTATION BERHAD FOR KKS TENNAMARAM (YEAR 2020) 

361,000.00

21

DESIGN, FABRICATE, SUPPLY, DELIVER TO SITE, INSTALL, COMMISION AND GUARANTEE PERFOMANCE OF BIOCATALYST APPLICATION AND MONITORING SYSTEM FOR SIME DARBY PLANTATION BERHAD FOR KKS MEROTAI (YEAR 2020) 

406,000.00

FEATURED PROJECTS

DEWATERING SYSTEM PAGOH JOHOR

INSTALLATION OF MEMBRANE RECOVERY INTERGRATED SYSTEM AT KKS BENUT

INSTALLATION OF MEMBRANE RECOVERY INTERGRATED SYSTEM AT KKS BENUT

DESIGN, SUPPLY, FABRICATE INSTALL, TEST, COMMISSION AND GUARANTEE FOR 65MT/HR DEWATERING SYSTEM AT KKS LAVANG, BINTULU, SARAWAK

TO SUPPLY, FABRICATE AND COMMISSION OF 1 LOT BIOCATALYST APPLICATION & MONITORING SYSTEM (BAMS) FOR R&D TENNAMARAM EXPERIMENTAL STATION (TEST) AT BESTARI JAYA, SELANGOR

CONSTRUCT OF 30M3/HR LEACHATE TREATMENT PLANT AT JABI LANDFILL, ALOR SETAR, KEDAH.

CONSTRUCT OF 30M3/HR LEACHATE TREATMENT PLANT AT PADANG SIDING LANDFILL, ARAU, PERLIS.

1M3/HR PILOT SCALE FOR ADVANCE ELECTRO OXIDATION FOR SIME DARBY, KKS TENNAMARAM, BESTARI JAYA, SELANGOR.

INSTALLATION OF POME TREATMENT PLANT AT SK GUA MUSANG.

PAMOL